top of page
BEARFORCE-DRILLING-INC.-logo
Foundation drilling rig operating on urban construction site in Ontario

Foundation, Shoring & Infrastructure Drilling Subcontractor

Ontario-based • Available across Canada • Indigenous-Owned

SERVICES

FOUNDATION CAISSON DRILLING

Structural foundation caissons for bridges, buildings, utilities, energy infrastructure, industrial work, and civil infrastructure foundations.

DRILLED SHAFTS

Large-diameter drilled shafts for structural, heavy civil, infrastructure, utility, energy, mining infrastructure, and deep foundation applications.

SOLDIER PILE DRILLING

Drilled holes for soldier pile and lagging shoring systems.

SECANT WALL DRILLING

Primary and secondary secant pile drilling for overlapping excavation-support wall systems where specified.

SHORING & EXCAVATION-SUPPORT DRILLING

Drilling support for temporary and permanent shoring systems.

HEAVY CIVIL / INFRASTRUCTURE FOUNDATION DRILLING

Project-specific foundation drilling support for infrastructure, utility, energy, mining infrastructure, industrial, and nuclear-support scopes.

SHEET PILE INSTALLATION SUPPORT

BearForce can support project-specific sheet pile installation for temporary shoring, excavation support, water control, utility, infrastructure, and heavy civil scopes.

 

Support may include crawler crane operation, vibratory hammer support, sheet handling, layout coordination, installation sequencing, and field support under prime-contractor, engineer, or site-supervisor direction.

 

Sheet pile work is subject to site access, ground conditions, vibration considerations, utility locates, equipment availability, engineered requirements, insurance, union, and regulatory requirements.

HOISTING, RIGGING & CRANE SUPPORT

BearForce can support project-specific hoisting, rigging, crane operation, lift coordination, and field supervision scopes where they relate to infrastructure, foundation, shoring, utility, energy, mining infrastructure, nuclear-support, industrial, telecom, and heavy civil work.

 

Available support may include crane operation and field supervision support, hoisting and rigging coordination, lift coordination, site planning and logistics support, box culvert and precast installation support, monopole, telecom, and structural erection/dismantling support, sheet pile and vibratory hammer support, barge-based drilling and hoisting support where project conditions and approvals allow, and emergency crane-support response subject to equipment, operator, insurance, and site availability.

 

Lift planning, engineered lift review, personnel basket work, barge work, critical lifts, tandem lifts, and specialized rigging are handled on a project-specific basis and are subject to applicable engineering, safety, insurance, site, union, and regulatory requirements.

WHY
BEARFORCE

100% Indigenous-owned and owner-operated specialty subcontractor

CCIB Certified Indigenous Business, with Federal Indigenous Business Directory / PSIB registration under review

Foundation, shoring, excavation-support, and infrastructure drilling focus

Kelly-method rotary foundation drilling capability for caissons, drilled shafts, soldier piles, secant walls, and heavy civil foundation scopes

Qualified field leadership: 339A Red Seal Mobile Crane Operator & 270+ kNm Foundation Drill Rig Operator

Project-specific hoisting, rigging, sheet pile, and crane-support capability where required

Fully insured for drilling specialist operations, with project-specific insurance capacity available through broker for increased limits, rented equipment, additional insured requirements, and Canada-wide project support

Built to integrate under established GCs, EPCs, utilities, civil contractors, mining infrastructure teams, energy companies, and major project owners

Execution-focused subcontractor working from engineered drawings, specifications, approved methods, and prime-contractor direction

Drilling-only and defined support scopes, keeping design responsibility, geotechnical interpretation, grouting design, and engineered temporary works clearly assigned to the project engineer, prime contractor, or retained professional engineer unless separately agreed.

EXPERIENCE

Caisson drilling shaft with gravel base at bottom of excavation
Secant wall drilling with aligned piles along excavation

Caisson drilling

secant wall drilling

Representative project experience (operator-led)

Representative project experience (operator-led)

SAFETY

BearForce is committed to safe, planned, and controlled field execution on every project.

Our safety approach includes:

■ Site-specific FLHA/JHA before work begins

■ Equipment inspections and daily pre-use checks

■ Lift planning coordination for hoisting, rigging, sheet pile, and crane-support work

■ Competent supervision and qualified operator involvement

■ Engineered drawings, approved methods, and project specifications followed before execution

■ Clear communication with prime contractors, site supervisors, engineers, inspectors, and other trades

■ Emergency response planning, incident reporting, and hazard-control procedures

■ WSIB/WCB and project-specific safety requirements coordinated based on job location and contract scope

BearForce is structured to integrate under established project teams and follow site-specific safety programs, prequalification requirements, orientation processes, permit systems, and contractor controls.

Contact

For supplier registration, procurement, Indigenous business inquiries, drilling scopes, and company-level opportunities:

John McGillivray
President / Owner-Operator
BearForce Drilling Inc.
john@bearforce.ca
416-830-2737

For hoisting, rigging, crane-support, field operations, lift coordination, and project execution discussions:

Rob Bowden
Crane & Field Operations Manager
BearForce Drilling Inc.
rob.bowden@bearforce.ca
905-229-9992

Ontario-based. Available across Canada.

bottom of page